Architects: TAROS NOVA a.s.
- Year: 2022
-
Photographs:Denis Pagáč
-
Manufacturers: Redaelli Tecna s. p. a.
- Managing Director, Team And Project Management: Radek Ondruch
- Production Manager, Production And Construction Management: Aleš Gebauer
- Chief Design Engineer, Design And Structural Engineering Management: Václav Röder
- Senior Structural Engineer, Structural Engineering And Statics: Ondřej Orság
- Design Engineer, Design Works: Jiří Kozák
- Delivery Of Special Steel Ropes Flc, Production And Installation Of Steel Ropes: Redaelli Tecna S.p.A., Business Unit Tensostructures
- Bridge Length: 721 m
- Height Above Ground: 95 m
- Weight Of Bridge: 234 t
- Clients: Horský Resort Dolní Morava
- Investor: SNĚŽNÍK, a.s.
- Design & Build: TAROS NOVA a.s.
- Structural Engineers: TAROS NOVA a.s.
- Constructions: TAROS NOVA a.s.
- City: Dolní Morava
- Country: Czech Republic